Payday Loans

Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
Contact
Contact our Department of Dams, Hydropower, Mines, and Roads
Address:
Jaroslava Černog 80
Pinosava-Belgrade
11226
Serbia

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Telephone: + 381 11 390 64 86
Fax: + 381 11 390 64 86

Information: Managing Director:
Dr. Dejan Divac, CE

 














RocketTheme Joomla Templates