Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
Projects
Department of Dams, Hydropower, Mines, and Roads: Selected Projects
Re-alignment of the Kolubara River Channel, Phase 1 PDF Print E-mail

altGeneral Description

The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends to Koceljeva to the west, Rudovci and Prkosava to the East, Stepojevac to the North, and Lajkovac (Slovac) to the south. The basin envelops the middle and lower courses of the Kolubara River and its main tributaries: the Lukavica, the Peštan, the Turija and the Beljanica to the east, and the Tamnava (including the Ub) and the Kladnica to the west. The east-west axis of the basin is 55 km long, and the north-south axis is 15 km long. Parts of the municipalities of Lazarevac, Obrenovac and Koceljeva lie within the basin.

Of the total surface area of the basin of some 600 km2, geological exploration has revealed coal deposits on only 167 km2. The remainder is barren land, from a coal mining perspective.

The Kolubara River divides the basin into eastern and western areas. The eastern area lies between the Turija, Peštan and Kolubara rivers. Based on the extent of past exploration and the level of preparedness for open-pit mining, this area was sub-divided into nine extraction units: A, B, C, D, E, F, G, Veliki Crljeni, and Šopić-Lazarevac.

Read more (available only in Serbian)...

 
Vlasina Water Information System, Phase 1 PDF Print E-mail

HIS_Vlasina_2007_reke_grafClient: Electric Power Industry of Serbia
Chief Analyst: Dr. Dejan Divac, CE
Project Team: Dr. Zdravko Stojanović, CE; Zoran Simić, CE; Miomir Arsić, CE; Dejan Vučković, CE; and Dušan Mikavica, GE

The Vlasina HPP simulation model is comprised of: a simulation model database, a user interface, and mathematical simulation software. The database is GIS-oriented (Arc Hydro model) and contains all necessary information about the system (data sets, performance characteristics, thematic river basin components, and the like).

Read more...
 
Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP PDF Print E-mail

he_neretvaClient:  Electric Power Industry of Republika Srpska
Chief Design Engineers: Dr. Dejan Divac, CE; Dejan Vučković, CE; and Dragan Vukosavić, ME

The following design documents were developed in 2007:

- Neretva-Ulog HPP:  Preliminary Design and Prefeasibility Study;
- Janjske Otoke HPP:  Preliminary Design and Prefeasibility Study;
- Bileća HPP:  Preliminary Design and Feasibility Study.

 

Read more...
 
FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation PDF Print E-mail
FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the CADSES Region
(INTERREG III B CADSES Inter-regional Cooperation Program)

altClient:  European Union Delegation to the Republic of Serbia
Expert Team: Dr. Dejan Divac, CE; Dr. Marina Babić Mladenović, CE; Dr. Stevan Prohaska, CE; Dr. Nikola Milivojević, ME; Vladimir Milivojević, ME; Zoran Simić, CE; and Zoran Dubajić, EE

This two-year project was supported by the EU Delegation to the Republic of Serbia via the INTERREG III B CADSES Program. It was launched in 2006 and completed in 2008. Project participants included 13 partners from nine different countries.

 

Read more...
 
Training of the Peštan River PDF Print E-mail

Geological Background Information and Data Required for the Development of a Preliminary Design for the Training of the Peštan River and Flood Evacuation Control


The lower course of the Peštan River intersects the Kolubara Coal (lignite) Basin. It crosses the future extraction Field E and, in the vicinity of its confluence with the Kolubara River, the South Field. Since these two open-pit mines will constitute the coal extraction focal point of the Kolubara Coal Basin in the foreseeable future, the river channel will need to be re-aligned in due time to free-up the area of future activity, and flood waters of the Peštan River will have to be controlled to protect mining operations.

Read more...
 