Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
Projects Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP
Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP PDF Print E-mail

he_neretvaClient:  Electric Power Industry of Republika Srpska
Chief Design Engineers: Dr. Dejan Divac, CE; Dejan Vučković, CE; and Dragan Vukosavić, ME

The following design documents were developed in 2007:

- Neretva-Ulog HPP:  Preliminary Design and Prefeasibility Study;
- Janjske Otoke HPP:  Preliminary Design and Prefeasibility Study;
- Bileća HPP:  Preliminary Design and Feasibility Study.

 


he_neretva_02

 

The Neretva-Ulog HPP project is a result of the assessed hydropower potential of the upper course of the Neretva River in Republika Srpska (downstream from the Town of Ulog). The system will be comprised of:

- A dam and reservoir (at Nedavić);
- A delivery system (Nedavić-Grad);
- A dam and reservoir (at Grad);
- Diversion-type Nedavić HPP (Qins = 35 m3/s; Pins = 33 MW; Eyr = 75 GWh);
- Run-of-river-type Grad HPP (Qinss = 4 m3/s; Pins = 3 MW; Eyr = 11 GWh).

 

 

The Janjske Otoke HPP will be located on the Janj River (western Republika Srpska), which empties into the Plav River (the Vrbas River Basin) near the Town of Šipovo. Given that the landscape in the HPP site area is extremely attractive, the position of the Project Engineer was that all hydropower and water management facilities should be installed away from the immediate Janjske Otoke zone (i.e., upstream and downstream). The proposed solution includes:

  • Phase 1: Downstream intake, a long diversion conduit and an HPP at Mujdžić - Qins=16 m3/s, Pins=7.54 MW, Eyr=35.39 GWh;
  • Phase 2: Upstream dam and run-of-river HPP - Qinss=2.5 m3/s, Pins=0.6 MW, Eyr=3.83 GWh, plus a short-conduit diversion-type HPP - Qins=6 m3/s, Pins=2.95 MW, Eyr=4.85 GWh.


The system of hydroelectric power plants on the Trebišnjica River, East Herzegovina, will include the Bileća HPP for purposes of which water from „Upper Horizons“ will be delivered via the Fatnica-Bileća Tunnel to the Bileća Reservoir. The characteristics of this flow-through facility will be:
Qins = 60 m3/s
Pins = 33 MW
Eyr = 116 GWh (including Nevesinje waters)