Payday Loans

Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
References
Department of Dams, Hydropower, Mines, and Roads: Recent References PDF Print E-mail

Geological Background Documents for the Preliminary Design of Training of the Peštan River and Flood Discharge Control
Volume 4:  Kruševica Dam and Retention Basin on the Peštan River
Section 1:  Design of Geotechnical Investigations
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Vlasina Hydroelectric Power Plants, Rehabilitation of the Strvna and Čemernik Water Delivery Lines: Investigations, Design and Rehabilitation Supervision
Year: 2009
Client: Iron Gate Hydroelectric Power Plants LLC

Rehabilitation Design for 200 m of the Right Bank Downstream from the Bočac HPP:  Detailed Design
Year: 2009
Client: Electric Power Industry of Republika Srpska, Vrbas Hydroelectric Power Plants Corp.

Geological Background Documents for the Preliminary Design of Training of the Peštan River and Flood Discharge Control
Volume 1:  Construction Material Borrow Sites
Section 2: Investigations Report
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Rehabilitation of Lake Aleksandrovac: Detailed Design
Year: 2009
Client: Vranje Municipality

Geological Background Documents for the Preliminary Design of Training of the Peštan River and Flood Discharge Control
Volume 3:  Dam and Retention Basin on the Bistrica River
Volume 2:  Report on Geotechnical Investigations
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Geological Background Documents for the Preliminary Design of Training of the Peštan River and Flood Discharge Control
Volume 1:  Construction Material Borrow Sites
Volume 3:  Report on Geotechnical Investigations of Rock Borrow Sites
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Detailed Design for Landslide Remediation in the Local Community of Mirosaljci, Lazarevac Municipality
Section 1:  Engineering Geology Data
Year: 2009
Client: Construction Directorate of Lazarevac

Preliminary Design for the Relocation of a Bridge Across the Kolubara River, a New Bridge Across the Peštan River, and the Relocation of a Road Around the Field G Strip Mine: First Preliminary Report
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Preliminary Design and Feasibility Study for the Re-alignment and Training of the Kolubara River and its Peštan Tributary in the Kolubara Strip Mines Area
Volume 1: Project Summary; Section 2/1: Hydrologic and Psammologic Data
Volume 2/2:  Topography
Volume 2/3:  Geology
Volume 3: Training of the Kolubara and Peštan Rivers; Section 3/1: Technical Report
Volume 3: Training of the Kolubara and Peštan Rivers; Section 3/2:  Training of the Kolubara River Channel
Volume 3: Training of the Kolubara and Peštan Rivers; Section 3/3:  Training of the Peštan River Channel
Volume 4: Monitoring Project for the Re-aligned Kolubara and Peštan River Channels
Year: 2009
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Design for the Remediation of Seepage under the Višegrad HPP Dam
Volume 1: Design for Project-Specific Investigations
Volume 2: Report on the Collation of Results from Prior Investigations
Volume 3: Report on Geodetic Surveys
Volume 4: Report on Geological Exploration
Volume 5: Report on Exploratory Boring and Borehole Investigations
Volume 6: Report on Geophysical Investigations
Volume 7: Report on Hydrogeological Investigations
Volume 8: Report on Mathematical Model Tests
Volume 9: Summary Report on Investigations
Volume 10: Remediation Design Report
Year: 2009
Client: Electric Power Industry of Republika Srpska, Drina Hydroelectric Power Plants Corp.

Re-alignment and Training of the Kolubara River Channel in the Tamnava Strip Mines/East Field Area, Phase 1, Commissioning Tests: Groundwater Level Regime Monitoring Design
Year: 2008
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Revitalization of Lake Aleksandrovac: Master Plan
Year: 2008
Client:  Vranje Municipality

Report on the Present State, Potential, and Cost-Effectiveness of the Boškov Most HPP in Macedonia
Year: 2008
Client: Energy Financing Team, Switzerland

Vlasina HPP’s, Rehabilitation of Access Platform to the Vrla 1 HPP:  Detailed Design
Year: 2008
Client: Iron Gate Hydroelectric Power Plants LLC

Janjske Otoke HPP:  Design Concept and Prefeasibility Study
Year: 2008
Client: Electric Power Industry of Republika Srpska

Design Documents for Protection of the Tamnava Strip Mines/West Field from Groundwater
Volume 1:  Protection Concept
Volume 2:  Technical Conditions for Construction  
Year: 2008
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Ashta HPP Expert Technical Analysis
Year: 2008
Client: Energy Financing Team, Switzerland

Training of the Gradska River between the Niš-Skopje Highway and Its Confluence with the Južna Morava River:  Detailed Design
Year: 2008
Client: Vranje Municipality

Utilization of the Hydropower Potential of the Upper Drina and Sutjeska Rivers Within the Territory of Republika Srpska:  Design Concept and Prefeasibility Study – Report on Hydrological and Meteorological Conditions
Year: 2008
Client: Electric Power Industry of Serbia

Re-alignment and Training of the Kolubara River Channel in the Tamnava Strip Mines/East Field Area:  Phase 1, As-Built Design
Volume 1:  Presentation of As-Built Structural Components
Volume 3:  Graphical and Numerical Documentation
Volume 4:  Relevant Formal Communications During the Course of Construction
Year: 2008.
Client: Kolubara Mining Co., Baroševac Strip Mines Division

Preliminary Design and Feasibility Study for a Small Hydroelectric Power Plant on the Đetinja River (Vrutci SHPP)
Year: 2008
Client: Serbia Waters

Status and Vulnerability Assessment of the Nikola Tesla A TPP Tunnel Outlet Plunge Pool, and Detailed Rehabilitation Design
Year: 2008
Client: Nikola Tesla A Thermoelectric Power Plant

Vrbas Water Information System: Simulation Model, Version 1.0
Volume 1:  Concept and Mathematical Model
Volume 2:  Database
Volume 3:  Model Manual, Parameters, and Application Examples
Year: 2008
Client: Electric Power Industry of Republika Srpska, Vrbas Hydroelectric Power Plants Corp.

Utilization of the Hydropower Potential of the Upper Drina and Sutjeska Rivers Within the Territory of Republika Srpska: Preliminary Design and Prefeasibility Study
Volume 2:  Hydrometeorological Report
Volume 8:  Energy Efficiency Report
Volume 9:  Environmental Impact Assessment and Assessment of Potential Conflicts of Stakeholder Interests
Year: 2008
Client: Electric Power Industry of Serbia

Supplemental Flood Evacuator from the Bočac HPP Reservoir: Final Design and Construction Documents
Volume 1:  Engineering Geology Summary Report  
Volume 2:  Preliminary Design
Volume 3:  Detailed Design Report
Volume 4:  Calculations and Analyses
Year: 2008
Client: Electric Power Industry of Republika Srpska, Vrbas Hydroelectric Power Plants Corp.

Mathematical Model for Hydropower Estimation and Operational Management of the Iron Gate 1 and Iron Gate 2 Systems
Volume 1:  Conceptual, Theoretical and Software Background
Volume 2:  Data and Parameters
Volume 3:  Model Manual and Application Examples
Year: 2008
Client: Iron Gate Hydroelectric Power Plants LLC

 

presentation_buton

RocketTheme Joomla Templates