Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
References Other References
Department of Dams, Hydropower, Mines, and Roads: Other References PDF Print E-mail

Neretva-Ulog, Janjske Otoke and Bileća HPP’s
Year: 2007
Client: Electric Power Industry of Republika Srpska

Hydroelectric Power Plants on the Bistrica and Janjina Rivers (B-1, B-2, B-3 and J-1)
Year: 2007
Client: Electric Power Industry of Republika Srpska

Rehabilitation of the Garaši Dam
Year: 2007
Client: Planning and Construction PE of Aranđelovac

Training of the Peštan River and Flood Evacuation Control
Year: 2007
Client: Kolubara Mining Co.

Vlasina Water Information System, Phase 1
Year: 2007
Client: Electric Power Industry of Serbia

Hydrologic Studies of the Upper Neretva River, the Janj River and the Fatničko Polje-Lake Bileća Tunnel
Year: 2007
Client: Electric Power Industry of Republika Srpska

Updating of Iron Gate 1 and Iron Gate 2 Monitoring Systems
Year: 2007
Client: Iron Gate Hydroelectric Power Plants LLC

Dam Monitoring
Year: 2007
Client: Iron Gate Hydroelectric Power Plants LLC, and Serbia Waters

Monitoring of the Višnjica Tunnel
Year: 2007
Client: Building Land and Construction Directorate of Belgrade

Confluence-Veliko Selo Interceptor Sewer in Belgrade:  Tunnel Section from Višnjica to the Veliko Selo PS, km 6+800 to km 12+639
Year: 2006
Client: Building Land and Construction Directorate of Belgrade

Prvonek Dam:  Construction Supervision, Final Design and Construction Documents, and Commissioning Tests
Year: 2003-2006
Client: Water Utility of Vranje

Bogovina Dam:  Preliminary Design (9 volumes); Detailed Design, Part A – Background Information and Data (20 volumes); Detailed Design, Part B – Technical Solutions (21 volumes)
Year: 2003-2006
Client: Bogovina System Construction and Operation PE

Reconstruction of Structures Within the Vlasina HPP System
Year: 2006
Client: Iron Gate Hydroelectric Power Plants LLC

Drina Information System
Year: 2006
Client: Electric Power Industry of Serbia/Drina and Lim HPP’s; Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate; and Serbian Ministry of Science and Environmental Protection

Mathematical Model for Hydropower Estimation and Operational Management of the Iron Gate 1 and Iron Gate 2 Systems
Year: 2006
Client: Iron Gate Hydroelectric Power Plants LLC

Flood Control and Protection of the Kolubara Strip Mines against the Adverse Effects of Water
Year: 2006
Client: Kolubara Mining Co.

Studenica SHPP
Year: 2006
Client: Serbian Imperial Laura, Studenica Monastery

Ćelije SHPP
Year: 2006
Client: Serbian Energy Efficiency Agency, European Agency for Reconstruction

Definition of a System of Structures
Year: 2006
Client: Electric Power Industry of Serbia  

Monitoring of the Iron Gate HPP’s:  Design Update
Year: 2006
Client: Iron Gate Hydroelectric Power Plants LLC

Study of High Dam Maintenance, Management and Monitoring, Part 1: Assessment of Existing Dams and Reservoirs
Year: 2005
Client: Serbia Waters

Prvonek Dam: Monitoring and Management Software Development and Equipment Installation  
Year: 2005
Client: Water Utility of Vranje and Serbia Waters

Drina Water Information System, Phase 2:  Simulation Model, Version 2.0
Year: 2005
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Feasibility Study of Small Hydroelectric Power Plants in Serbia, Part 2:  Assessment of Ten Select Projects (Barje, Bresnik, Ćelije, Dubočica, Lakat, Parmenac, Rejošnica, Sokolja 1 and 2, Stalać and Vrutci)
Year: 2005

Protection of the Tamnava Strip Mines/West Field from Floods in the Kladnica Catchment Area:  Detailed Design, Phase 1: Addendum to Detailed Design
Year: 2005
Client: Kolubara Mining Co.

Re-alignment and Training of the Kolubara River Channel Within the Area of the Tamnava Strip Mines/East Field, Phase 1
Year: 2005
Client: Kolubara Mining Co.

Industrial Bridge Across the Re-aligned Channel of the Kolubara River to the Tamnava Strip Mines/East Field
Year: 2005
Client: Kolubara Mining Co.

Simplified Mining Design for the Northern Lateral Drainage Canal of the Tamnava Strip Mines/West Field:  Hydraulic Engineering Component
Year: 2005
Client: Kolubara Mining Co.  

Feasibility of Relocation of Capital Infrastructures and Streams for Purposes of Open-Pit Coal Mining in the Kolubara Coal Basin
Year: 2005
Client: Electric Power Industry of Serbia

Training of the Simić Creek to the Kladnica Retention Basin
Year: 2005
Client: Kolubara Mining Co.

Study of the Impact of the Višegrad HPP on Riparian Lands Near the Cities of Goražde and Višegrad
Year: 2005
Client: Electric Power Industry of Republika Srpska

Hydraulic Engineering of the Sava River Channel and Riparian Lands Between Umka and Dubovo for Purposes of Construction of the Е 763 Highway from Belgrade to the Southern Adriatic Coast
Year: 2005
Client: Institute of Roads

Gruža Dam:  Design for Updating of the Dam Monitoring System
Year: 2005

Bajina Bašta Pumped-Storage HPP:  Water Delivery and Discharge Components, Overhaul Design
Year: 2005
Client: Bajina Bašta HPP

Rehabilitation of the Mladost Sports Center Dam in the City of Čačak
Year: 2004 (two months)
Client: Čačak Municipality

Sveta Petka HPP
Year: 2004
Client: Electric Power Industry of Macedonia

Hydrologic Assessments of Weekly Discharges at HPP Monitoring Sites
Year: 2004
Client: Electric Power Industry of Serbia

Beška Bridge: Rock Deformability Tests (Dilatometer Method)
Year: 2004
Client: IMS

Zemun Polje-Danube Storm Drain, Volume 3:  Detailed Design, Geotechnical Component
Year: 2003
Client: Building Land and Construction Directorate of Belgrade

Protection of the Tamnava Strip Mines/West Field from Floods in the Kladnica Catchment Area:  Detailed Design, Phase 1
Year: 2002-2003
Client: Kolubara Mining Co., Tamnava West Field

Bogovina Regional Water Supply System, Crni Timok Subsystem:  Bogovina Dam
Year: 2003
Client: Bogovina System Construction and Operation PE

Reports on 2002 Geodetic Surveys of the Rastovnica, Bresnica, Bovan, Krajkovac, Bor, Rudnik and Pridvorica Dams
Year: 2003

Rehabilitation and Revitalization of the Bukulja Dam
Year: 2002-2003
Client: Planning and Construction PE of Aranđelovac

Rehabilitation and Upgrading of the Bukulja Dam and Appurtenances:  Detailed Design
Year: 2002
Client: Planning and Construction PE of Aranđelovac

Final Design and Construction Documents for the Prvonek Dam
Year: 2002

Drina Information System:  Simulation Model, Phase 1
Year: 2002
Client: Electric Power Industry of Serbia

Feasibility Assessment of the Vrutci HPP
Year: 2002
Client: Electric Power Industry of Serbia

2002 Monitoring of the Zlatibor, Lazići, Barje, Brestovac and Rudnik Dams:  Report and Data Interpretation
Year: 2002

Study of Alternative Scenarios for the Development of the Drina Water System, Phase 1
Year: 2001
Client: Serbian Ministry of Agriculture, Forestry and Water Management

2001 Monitoring of the Gruža, Sokolovica, Barje and Rudnik Dams:  Report and Data Interpretation
Year: 2001

Design for Geotechnical Investigations at the Sveta Petka HPP Dam Site
Year: 2001
Client: Electric Power Industry of Macedonia

Ključ Dam and Reservoir, Phase 1:  Detailed Design
Year: 2000
Client: Lebane Municipality

Vrtogoš Dam and Reservoir
Year: 2000
Client: Water Utility of Vranje

Lepenac Regional Water System:  Master Plan
Year: 2000
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Re-alignment and Training of the Kolubara, Peštan, Lukavica and Vraničina Rivers Within the Area of the Tamnava Strip Mines/East Field and Future Fields:  Master Plan
Year: 2000
Client: Electric Power Industry of Serbia  

2000 Monitoring of the Gruža, Zlatibor, Barje, Rudnik and Brestovac Dams:  Report and Data Interpretation