Payday Loans

Re-alignment of the Kolubara River Channel, Phase 1

General Description The Kolubara Coal Basin is located some 50 km southwest of Belgrade. It extends...

Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

Client:  Electric Power Industry of Republika SrpskaChief Design Engineers: Dr. Dejan Divac, CE;...

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation and Prevention in the...

Training of the Peštan River

Geological Background Information and Data Required for the Development of a Preliminary Design for...

Rehabilitation of Lake Aleksandrovac

Lake Aleksandrovac lies between the towns of Aleksandrovac and Kupinice in the Vranje Municipality,...

Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

Following the opening of the Veliki Crljeni strip mine, the Coal Extraction Development Strategy for...

  • Re-alignment of the Kolubara River Channel, Phase 1

    Tuesday, 11 May 2010 16:57
  • Vlasina Water Information System, Phase 1

    Friday, 19 November 2010 16:33
  • Neretva-Ulog HPP, Janjske Otoke HPP, and Bileća HPP

    Friday, 19 November 2010 16:57
  • FLOODMED: Monitoring, Forecasting and Best Practices for Flood Mitigation

    Tuesday, 11 May 2010 17:26
  • Training of the Peštan River

    Tuesday, 11 May 2010 17:17
  • Rehabilitation of Lake Aleksandrovac

    Tuesday, 11 May 2010 17:25
  • Preliminary Design for the Re-alignment of the Kolubara River Channel, Phase 2

    Tuesday, 11 May 2010 17:06
Departments Department of Dams, Hydropower, Mines, and Roads
Department of Dams, Hydropower, Mines, and Roads PDF Print E-mail

altThe Department of Dams, Hydropower, Mines, and Roads addresses a number of highly-complex areas. Its major activities include:

  • Hydrologic and hydraulic analyses and hydropower potential assessments of rivers and basins;
  • Environmental impact assessments of hydroelectric power plants;
  • Studies and projects for multi-purpose use of water resources at different levels;
  • Dam studies, projects, and construction supervision;
  • In situ static and dynamic monitoring of the performance of hydraulic structures;
  • Determination of mechanical properties of soils based on field investigations and laboratory tests, for design purposes.


The Department is especially proud of its references: Study of the Available Hydropower Potential of the Drina River; Water Information Systems for the Drina and Vlasina Rivers; Detailed Designs for the Prvonek and Bogovina Dams; and Feasibility Study of the Neretva-Ulog, Janjske Otoke and Bistrica Hydroelectric Power Plants.

 

presentation_buton

RocketTheme Joomla Templates