Hydraulic Model Study of the ‘’Foča’’ Dam And HPP

Client: Electric Power Industry of Republic of Srpska, parent joint-stock company, Trebinje ...

Hydraulic Measurments In HPP “Perućica”

Client: “EPP-MNE” Nikšić ...

Study Report On Mini-HPP Prvonek’s Turbine Efficiency Level

Client: Electric Power Industry of Serbia ...

’’25. Maj’’ Museum’s Fountain Rehabilitation Main Design

Client: The City of Belgrade, City Administration, Secretariat for Utilities and Housing...

Hydraulic Model Tests of Beška Bridge Piers on the Danube

Client: Alpine Ltd. Team of researchers: Novica Petrovic, B.Sc. C.E., Milan Rula, B.Sc. C.E. Follo...

Protection of the Makiš Water Intake from Suspended Sediment and Bedload of the Sava River

Client: City of Belgrade/Department of Housing and Utilities Chief Designer: Novica Petrović, CE...

Hydraulic Model Tests of the Bogovina Dam Spillway and Stilling Basin

Client: Bogovina PE, Bor Chief Analyst: Dragiša Žugić, CE Analyst: Novica Petrović, CE ...

Determination of Drainage Station Capacities in the Riparian Lands of the Iron Gate 1 and Iron Gate

Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC, Kladovo Chief...

  • Hydraulic Model Study of the ‘’Foča’’ Dam And HPP

    Thursday, 31 January 2013 16:39
  • Hydraulic Measurments In HPP “Perućica”

    Thursday, 31 January 2013 16:27
  • Study Report On Mini-HPP Prvonek’s Turbine Efficiency Level

    Thursday, 31 January 2013 16:12
  • ’’25. Maj’’ Museum’s Fountain Rehabilitation Main Design

    Thursday, 31 January 2013 16:01
  • Hydraulic Model Tests of Beška Bridge Piers on the Danube

    Thursday, 31 January 2013 15:43
  • Hydraulic Model Tests of the Inlet Structure of a Sewer Running from the Belgrade Ambulance Service to Venizelos Street

    Thursday, 31 January 2013 15:53
  • Protection of the Makiš Water Intake from Suspended Sediment and Bedload of the Sava River

    Thursday, 01 July 2010 11:40
  • Hydraulic Model Tests of the Bogovina Dam Spillway and Stilling Basin

    Thursday, 01 July 2010 12:46
  • Determination of Drainage Station Capacities in the Riparian Lands of the Iron Gate 1 and Iron Gate

    Tuesday, 16 March 2010 22:37
Projects
Department of Hydraulics: Selected Projects
Hydraulic Model Study of the ‘’Foča’’ Dam And HPP PDF Print E-mail

foca-1Client: Electric Power Industry of Republic of Srpska, parent joint-stock company, Trebinje

Team of researchers: Dragiša Žugić, B.Sc. C.E., Danica Starinac, B.Sc. C.E., Novica Petrović, B.Sc. C.E., Predrag Vojt, B.Sc. C.E.

The designed concrete gravity dam "Foča" has been tested on a hydraulic physical model in order to justify the proposed technical solution.

Read more...
 
Hydraulic Measurments In HPP “Perućica” PDF Print E-mail

perucica-1Client: “EPP-MNE” Nikšić

Team of researchers: Dragisa Žugić,B.Sc. C.E., Danica Starinac, B.Sc. C.E., Predrag Vojt, B.Sc. C.E., Marko Dimitrijević B.Sc. C.E.

In June 2010 the Department of Hydraulics at Institute for Water Resources "Jaroslav Černi" conducted a major campaign for measurement as part of the Project for modernization and rehabilitation of hydropower plant "Perućica".

HPP "Perućica" is the oldest large hydropower plant in Montenegro, which started operating in 1960, with an installed capacity of 307 MW. Since the start of operation until now, hydropower has never worked with full installed capacity. Average annual production of electricity in the period 1960-1999 was 823 GWh, which represents 63% of the total production.

Read more...
 
Study Report On Mini-HPP Prvonek’s Turbine Efficiency Level PDF Print E-mail

prvonek-turbine-1Client: Electric Power Industry of Serbia

Team of researchers: Dragiša Žugić, B.Sc. C.E., Predrag Vojt, B.Sc. C.E., Marijana Damnjanović, B.Sc. C.E., Marko Dimitrijević, Electric Eng.

In order to examine the efficiency levels of the turbines, the following tests have been carried out on both the big and the small turbines of the mini-HPP. Operation tests on the big and small aggregates have been performed with the loads of 40, 50, 60, 70, 80, 90 and 100 %.

Read more...
 
’’25. Maj’’ Museum’s Fountain Rehabilitation Main Design PDF Print E-mail

25maj-1Client: The City of Belgrade, City Administration, Secretariat for Utilities and Housing Services
Team of researchers:
Dragiša Žugić, B.Sc. C.E., Novica Petrović, B.Sc. C.E., Danica Starinac, B.Sc. C.E.

In the relevant period, the Department of Hydraulics has continued with designing, construction and reconstruction activities of a number of fountains and drinking fountains.

In 2011, the main design for the rehabilitation of the fountain in front of the ''25. maj'' Museum. The fountain is located inside the Museum of Yugoslav History complex. The museum complex is located in Dedinje, the Urban Municipality of Savski Venac, Belgrade. It consists of ''25. maj'' Museum, the ''House of Flowers'', the Old Museum and the adjoining park. The fountain occupies the central part of the ''25. maj'' Museum front. The museum building dates from 1962, whereas the current appearance of its front is a result of the reconstruction which took place between 1978 and 1980, when the fountain was built according to the design of architects Branislav and Marija Jovin.

Read more...
 