Hydraulic Model Study of the ‘’Foča’’ Dam And HPP

Client: Electric Power Industry of Republic of Srpska, parent joint-stock company, Trebinje ...

Hydraulic Measurments In HPP “Perućica”

Client: “EPP-MNE” Nikšić ...

Study Report On Mini-HPP Prvonek’s Turbine Efficiency Level

Client: Electric Power Industry of Serbia ...

’’25. Maj’’ Museum’s Fountain Rehabilitation Main Design

Client: The City of Belgrade, City Administration, Secretariat for Utilities and Housing...

Hydraulic Model Tests of Beška Bridge Piers on the Danube

Client: Alpine Ltd. Team of researchers: Novica Petrovic, B.Sc. C.E., Milan Rula, B.Sc. C.E. Follo...

Protection of the Makiš Water Intake from Suspended Sediment and Bedload of the Sava River

Client: City of Belgrade/Department of Housing and Utilities Chief Designer: Novica Petrović, CE...

Hydraulic Model Tests of the Bogovina Dam Spillway and Stilling Basin

Client: Bogovina PE, Bor Chief Analyst: Dragiša Žugić, CE Analyst: Novica Petrović, CE ...

Determination of Drainage Station Capacities in the Riparian Lands of the Iron Gate 1 and Iron Gate

Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC, Kladovo Chief...

  • Hydraulic Model Study of the ‘’Foča’’ Dam And HPP

    Thursday, 31 January 2013 16:39
  • Hydraulic Measurments In HPP “Perućica”

    Thursday, 31 January 2013 16:27
  • Study Report On Mini-HPP Prvonek’s Turbine Efficiency Level

    Thursday, 31 January 2013 16:12
  • ’’25. Maj’’ Museum’s Fountain Rehabilitation Main Design

    Thursday, 31 January 2013 16:01
  • Hydraulic Model Tests of Beška Bridge Piers on the Danube

    Thursday, 31 January 2013 15:43
  • Hydraulic Model Tests of the Inlet Structure of a Sewer Running from the Belgrade Ambulance Service to Venizelos Street

    Thursday, 31 January 2013 15:53
  • Protection of the Makiš Water Intake from Suspended Sediment and Bedload of the Sava River

    Thursday, 01 July 2010 11:40
  • Hydraulic Model Tests of the Bogovina Dam Spillway and Stilling Basin

    Thursday, 01 July 2010 12:46
  • Determination of Drainage Station Capacities in the Riparian Lands of the Iron Gate 1 and Iron Gate

    Tuesday, 16 March 2010 22:37
References
Department of Hydraulics: Recent References PDF Print E-mail

Hydraulic Model Tests of Beška Bridge Pier Protection Components on the Danube River (Following Commissioning)
Year: 2009
Client: Alpine LLC

Hydraulic Analysis of the Impact of Beška Bridge Construction Activities on the Stages of the Danube River
Year: 2009
Client: Alpine LLC

Design for the Rehabilitation of a Public Tap in Košutnjak, Belgrade
Year: 2009
Client: City of Belgrade/Department of Housing and Utilities

Hydraulic Model Tests of the Entry Structure of the First Aid Service/Vanizelos Street Sewer in Belgrade
Year: 2009
Client: Urban Building Land and Construction Directorate of Belgrade

Trial Operation of the Prvonek Dam: Design for Tailrace and Downstream Flow Measurements
Year: 2009
Client: Water Utility of Vranje

Detailed Design for an Artificial Geyser at a Public Beach on the Save River in Šabac
Year: 2008
Client: Building Land Management PE of Šabac

Report on Hydraulic Model Tests of Water Ingress into Iron Gate 2 HPP Turbines
Year: 2008
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC, Kladovo

Trial Operation of the Prvonek Dam: Design for Drainage System and Tailrace Flow Measurements
Year: 2008
Client: Water Utility of Vranje

As-built designs for 9 water fountains in Belgrade
Year: 2008
Client: Water Supply and Sewerage Utility of Belgrade

Hydraulic Model Tests of Beška Bridge Pier Protection Components on the Danube River (Summary Volume)
Year: 2008
Client: Alpine LLC

Construction and As-built Design of a Water Fountain at the Terazije Terrace Office and Residential Building, Component B
Year: 2008
Client: Mali Kolektiv LLC, Belgrade

Report on Raw-water Transport System Flow Measurements Conducted at the Belgrade Groundwater Source
Year: 2008/2009
Client: Government of Serbia

Hydraulic Model Tests of Beška Bridge Pier Protection Components on the Danube River (Construction Phase)
Year: 2008
Client: Alpine LLC

 