Monitoring and Analysis of the Impact of the Iron Gate 1 HPP Reservoir in the 70.30 m a.s.l.

Monitoring and Analysis of the Impact of the Iron Gate 1 HPP Reservoir in the 70.30 m a.s.l....

Protection of the Town of Stari Kostolac from the Mlava River Floods

Protection of the Town of Stari Kostolac from the Mlava River Floods and of Low-lying Urban Areas...

Caving of Canals Running to Pumping Stations in the Riparian Lands of the Iron Gate 1 HPP Reservoir

Caving of Canals Running to Pumping Stations in the Riparian Lands of the Iron Gate 1 HPP Reservoir...

  • Monitoring and Analysis of the Impact of the Iron Gate 1 HPP Reservoir in the 70.30 m a.s.l.

    Monday, 05 July 2010 15:21
  • Protection of the Town of Stari Kostolac from the Mlava River Floods

    Friday, 02 July 2010 15:14
  • Caving of Canals Running to Pumping Stations in the Riparian Lands of the Iron Gate 1 HPP Reservoir

    Thursday, 01 July 2010 15:49
References Other References
Department of Hydrogeology and Groundwater: Other References PDF Print E-mail

Ongoing Monitoring and Assessment of the Impact of Iron Gate 1 and Iron Gate 2 HPP Reservoirs on the Danube River (annual reports on groundwater levels, performance of drainage systems protecting urban areas and farmland, and dike status)
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Detailed Design for the Water Supply Distribution Network from the Stig Groundwater Source to the Town of Kurjače
Client: Construction Directorate of the Veliko Gradište Municipality

Hydraulic Engineering Component of the Smederevo Industrial Zone Regulation Plan
Client: Land Development, Zoning and Construction Directorate of Smederevo

Assessment of the Current Situation and of the Need for Replacement of Self-discharging Wells along the First Drainage Line of the Iron Gate 1 HPNS
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Expert Opinion on the Condition of Infrastructure and Effectiveness of Protection of Riparian Lands of the Iron Gate 1 and Iron Gate 2 HPP Reservoirs (required for the issuance of a water permit)
Client:    Iron Gate Hydroelectric Power Plants LLC, Kladovo

Hydraulic Engineering Concept for Land Development within the Areas Covered by Regulation Plans for Obrenovac Center and the Belo Polje Suburb
Client: Construction PE of Obrenovac

Preliminary and detailed designs for the replacement of drainage wells of the Kovin Industrial Zone protection system for the Danube reservoir regime of 69.5+ at the mouth of the Nera River
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Definition of the Operating Mode of a System for the Withdrawal and Utilization of Industrial Water from the Danube River for Current and Future Needs of US Steel Serbia
Client: US  Steel Serbia

Detailed Design for a Closed Collector on the Old Tamnava Canal from km 2+187 to km 2+364
Client: Construction PE of Obrenovac

Study of the Extent of the Reservoir on the Danube and its Tributaries in the 69.5+ Backwater Regime at the Mouth of the Nera River: Kovin-Dubovac and Godomin Marsh Hydraulic Reclamation Zones
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Study of the Groundwater Regime in Belgrade, New Belgrade and Zemun for the Danube River Backwater Regime of 70.30 m a.s.l., Including a Design Concept for Protection Components
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Preliminary and detailed designs for the rehabilitation of unstable sections of drainage canals DK-2 and DK-3/1 on Gradište Island
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

2000-2005 Reports on the Impact of the Iron Gate 1 and Iron Gate 2 HPP Reservoirs on Riparian Lands
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Feasibility Study and Proposed Design Concept for the Rehabilitation of the М-1-2 Drainage Canal between Ivanovo and Pančevo due to Seepage-Induced Caving   
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Design for the Sanitary Protection of the Jelak-Smonice Groundwater Source of Water Supply for the Town of Veliko Gradište and Assessment of the Potential for Increasing Capacity while Maintaining Groundwater Quality
Client: Construction Directorate of the Veliko Gradište Municipality

Preliminary Design of Drainage Wells for the Protection of the Town of Kladušnica
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Preliminary and detailed designs for the section of the Kupinac Canal running through populated areas of the Obrenovac Municipality
Client: Construction PE of Obrenovac

Preliminary and detailed designs for upgrading of the drainage system in the Town of Usje for the 69.5+ backwater regime
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Study of the Extent of the Impact of the Reservoir on the Danube and its Tributaries in the 69.5+ Backwater Regime: Hydraulic Reclamation Zones of Knićanin-Čenta, Kovin-Ivanovo, and Ivanovo-Pančevo
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Study of the Impact of the Iron Gate 1 HPP Reservoir and Damage Caused by High Stages of the Danube River in the Areas of the Veliko Selo Marsh, Višnjica and Krnjača
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Preliminary and detailed designs for the protection of the Town of Stari Kostolac from flooding caused by high stages of the Mlava River, and for the protection of low-laying areas from groundwater and internal floods: Construction of a dike and drainage system
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Water Supply Master Plan for the Metropolitan Area of Brza Palanka
Client: Planning, Construction and Land Development PE of Kladovo

Preliminary and detailed designs for the protection of low-lying areas of the Town of Grabovac from high groundwater levels when the Iron Gate 2 HPP is operated in the 41.00/39.50 m a.s.l. backwater regime
Client: Construction Directorate of the Veliko Gradište Municipality

Preliminary and detailed designs for the regulation of a „connecting“ canal between the Old Tamnava Canal and the regulated Kupinac Canal, including a Tamnava Canal culvert
Client: Construction PE of Obrenovac

Feasibility Study of Maximized Groundwater Abstraction from the Ostrvo Source
Client: Serbian Ministry of Economy and Regional Development, and the Veliko Gradište Municipality

Master Plan and Prefeasibility Study of Water Supply for the Veliko Gradište Municipality through the Year 2030
Client: Serbian Ministry of Agriculture, Forestry and Water Management, and the Construction Directorate of the Veliko Gradište Municipality

Detailed Design for Groundwater Abstraction from the Ostrvo Source and Transport by Pressure Pipelines from the Wells to the Pumping Station
Client: Serbian Ministry of Economy and Regional Development, and the Veliko Gradište Municipality

Design of Detailed Hydrogeological Investigations of the Potential Carina Groundwater Source for the Metropolitan Area of the City of Kladovo
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Preliminary and detailed designs for the development and upgrading of the Jelak-Smonice Groundwater Source in Veliko Gradište: Pumping station and water reservoir
Client: Serbian Ministry of Agriculture, Forestry and Water Management, and the Construction Directorate of the Veliko Gradište Municipality

Detailed Design for the Rehabilitation of the Kulič Drainage System Protecting the Town of Kulič from High Groundwater Levels
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Detailed Design for the Rehabilitation of Canals Running to the Karaš 1 and Karaš 2 Pumping Stations
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Design of Safeguard Zones of the Carina Groundwater Source for the Metropolitan Area of the City of Kladovo
Client: Iron Gate Hydroelectric Power Plants LLC, Kladovo

Preliminary Design for the Prevention of Nitrate Pollution of the Jelak-Smonice Groundwater Source of Water Supply for the Town of Veliko Gradište
Client: Construction Directorate of the Veliko Gradište Municipality

 