  • Assessment of the March-May 2006 Flood Wave

    Monday, 05 July 2010 14:29
  • Use of the Riparian Lands of the Danube River in the Metropolitan Area of the City of Smederevo

    Monday, 05 July 2010 14:04
  • Training of Small Watercourses in the Topčider River Catchment Area

    Monday, 05 July 2010 13:53
References
Department of River Engineering: Recent References PDF Print E-mail

Scientific Projects

Serbian Ministry of Science and Technological Development Project: Development of Proposed Methodologies for Preliminary Flood Risk Assessment and Flood Maps per Directive 2007/60/ЕС of the European Parliament and Council dated 23 October 2007 (1 April 2009 to 31 December 2010)
Project Manager:  Dr. Marina Babić Mladenović

Serbian Technology Development Research Program: Development of a Mathematical Model of Flood Wave Propagation on the Danube River in Serbia, 2008–2009
Project Manager:  Dr. Marina Babić Mladenović

Engineering Projects

Expert Report on Hydrologic Activities at the Paljuvi-Viš Reservoir on the Kladnica River in the Year 2009
Year: 2010
Client: Kolubara Mining Co., Lazarevac

Master Plan for Protection Against the Adverse Effects of Water in the Jadar River Basin
Year: 2009
Client: Serbian Ministry of Agriculture, Forestry and Water Management, and Serbia Waters  

Study: Water Resource Utilization and Protection Prospects in South Serbia
Year: 2009
Client: Serbian Ministry of Economy and Regional Development, and Regional Chambers of Commerce of Leskovac and Niš

Preliminary Design for the Management of Water Resources in the Barič River Catchment Area
Year: 2009
Client: Construction PE of Obrenovac

Preliminary Design for the Jadar/Korenita/Floodway Canal System: Training of the Korenita River (rkm 0+000 – 10+100) and Construction of a Floodway Canal
Year: 2009
Client: Serbian Ministry of Agriculture, Forestry and Water Management, and Serbia Waters

Detailed Design for the Jadar/Korenita/Floodway Canal System: Training of the Korenita River (rkm 0+000 – 10+100)
Year: 2009
Client: Serbia Waters

Detailed Design for the Rehabilitation of the Jadar River Flood Protection System, Phase 1, rkm 2+610 to rkm 8+393
Year: 2009
Client: Serbia Waters

Preliminary Design for the Protection of the Kolubara TPP Ash and Slag Disposal Site from the Danube and Mlava River Floods
Year: 2009
Client: Kostolac Thermal Power Plants and Strip Mines

Detailed Design for the Protection of the Kolubara TPP Ash and Slag Disposal Site from the Danube and Mlava River Floods
Year: 2009
Client: Kostolac Thermal Power Plants and Strip Mines

Mechanization of the Removal and Disposal of Floating Sediments from the Zvornik HPP Reservoir: Master Plan for the Protection of the Zvornik HPP Reservoir from Surface Sediments
Year: 2009
Client: Drina and Lim Hydroelectric Power Plants/Bajina Bašta and Zvornik HPP’s

Prevention of Degradation of the Zvornik HPP Reservoir: Master Plan for the Protection of the Zvornik HPP from River Sediment
Year: 2009
Client: Drina and Lim Hydroelectric Power Plants/Bajina Bašta and Zvornik HPP’s

Evaluation of the Flood Protection System along the Tisa River from its Confluence with the Danube River to Tiszaug in Light of Extreme Flood Events in Hungary and Serbia in the Years 2000 and 2006
Year: 2009
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate

Update of the Water Management Master Plan of Serbia: Hydro-meteorological Component
Year: 2009
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate

Hydraulic Assessment of the Ub River Training Works Reconstruction Design for the Town of Ub
Year: 2009
Client: Serbia Waters

Master Plan and Prefeasibility Study for Protection Against the Adverse Effects of Water in the Jadar River Basin: Hydrologic Component
Year: 2009
Client: Serbia Waters

Preliminary Design for a Fish Passage on the Beli Timok River at the Debelica Bridge
Year: 2008
Client: Timočka Krajina Sportfishermen’s Association, Zaječar

Detailed Design for Protection of the Right Bank of the Sava River in the Vicinity of the Šabac Central Wastewater Treatment Plant
Year: 2008
Client:  Water Utility of Šabac

Master Plan for Flood Protection in the Barič River Watershed
Year: 2008
Client: Construction PE of Obrenovac

Enhanced Protection from the Adverse Effects of Water in the Jadar River Basin:  Project Design Package for Urgent Establishment of Flood Defenses on the Korenita River (11 km)
Year: 2008
Client: Serbia Waters

As-built Design for Dikes along the Velika Morava River: Section М.1.1. – Left Bank from the Confluence with the Danube to the Mouth of the Nova Jezava River
Year: 2008
Client: Serbia Waters

Monitoring and Assessment of the Impact of the Iron Gate 1 and Iron Gate 2 Hydro Power and Navigation Systems on the Riparian Lands of the Danube River (Program III, Iron Gate 1: Sediment Balance, 1998-2007 Annual Reports)
Year: 1999-2008
Client: Iron Gate Hydro Power Plants LLC

Monitoring and Assessment of the Impact of the Iron Gate 1 and Iron Gate 2 Hydro Power and Navigation Systems on the Riparian Lands of the Danube River (Program III, Iron Gate 2: Sediment Balance, 1998-2007 Annual Reports)
Year: 1999-2008
Client: Iron Gate Hydro Power Plants LLC

Study of Alternative Approaches to Ice Management on the Danube River in Serbia
Year: 2008-2009
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate

Urban Protection in the Morava River Valley: Training of the Velika Morava River Channel and Protection of Riverbanks and Dikes (rkm 29+000 to 56+000)
Client: Serbia Waters

Study of Flood Protection Enhancement in the City of Valjevo
Year: In progress
Client: Serbia Waters

 