Payday Loans
  • Assessment of the March-May 2006 Flood Wave

    Monday, 05 July 2010 14:29
  • Use of the Riparian Lands of the Danube River in the Metropolitan Area of the City of Smederevo

    Monday, 05 July 2010 14:04
  • Training of Small Watercourses in the Topčider River Catchment Area

    Monday, 05 July 2010 13:53
References Other References
Department of River Engineering: Other References PDF Print E-mail

Scientific Projects

Serbian Ministry of Science and Technological Development: Enhancement of Iron Gate Reservoir Monitoring and Protection, 2003-2004
Project Manager: Dr. Marina Babić Mladenović

Engineering Projects

Master Plan for the Training of the Velika Morava River from its Confluence with the Danube to the Confluence of the Zapadna Morava and Južna Morava Rivers
Year: 2007
Client: Serbia Waters

Study of the Practicability and Effectiveness of Sediment Dredging from the Iron Gate 1 HPP Reservoir
Year: 2007
Client: Serbian Ministry of Agriculture, Forestry and Water Management /Water Directorate, and Iron Gate Hydroelectric Power Plants LLC

Master Plan for the Regulation of Small Watercourses in the Topčider River Basin
Year: 2007
Client: Serbia Waters

Design for Emergency Rehabilitation of the Busur Dam Bottom Outlet
Year: 2007
Client: Serbia Waters /Sava-Danube WMC  

Design for Emergency Reconstruction of the Korenica Dam Bottom Outlet
Year: 2007
Client: Serbia Waters /Sava-Danube WMC  

Study of the Potential Use of the Danube River Riparian Lands in the Vicinity of the City of Smederevo
Year: 2007
Client: Serbia Waters

Detailed Design for a Temporary River Channel Structure for the Passage of Mining Machinery Across the Mlava River
Year: 2007
Client: Serbian Electric Power Industry of Belgrade/Zavoj HPP, Pirot

Detailed Design for a Revetment on the Danube River at the Ledinci Site
Year: 2007
Client: Belgrade Military Construction Center

Study of Training of the Right Bank of the Sava River between the Road Bridge and the „Old City“ of Šabac
Year: 2007
Client: Building Land Management PE of Šabac

Definition of a Network of Telemetric Gauge Stations on the Danube River and its Tributaries, and Assessment of the Feasibility of Using Water Level Data from the Network Operated by the Hydro-meteorological Service of Serbia
Year: 2007
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Guidance Document for Iron Gate 1 HPP Management During Extreme Flood Events
Year: 2007
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Assessment of the March-May 2006 Flood Wave
Year: 2007
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate

Monitoring and Assessment of the Impact of Iron Gate 1 HPNS and Iron Gate 2 HPNS Reservoirs on the Riparian Lands of the Danube River, Program IIIа, Iron Gate 1: Morphological Changes in the Reservoir Bed from 1976 to 2005/2006; and Iron Gate 2: Morphological Changes in the Reservoir Bed from 1985 to 2006
Year: 2007
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Estimation of Iron Gate 1 HPP Reservoir Water Levels in the Regime Defined in Appendix 1 to the Convention on the Utilization and Maintenance of the Iron Gate 1 HPP and the Iron Gate 2 HPP
Year: 2007
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Master Plan for the Training of the Zapadna Morava River from its Confluence with the Južna Morava River to the Confluence of the Đetinja and Moravica Rivers: Hydrologic Assessments
Year: 2007
Client: Serbia Waters

Inventory of Structures, Facilities and Works to which Provisions of Article 18 of the 1998 Convention on the Utilization and Maintenance of the Iron Gate 1 and Iron Gate 2 Hydro Power and Navigation Systems Apply
Year: 2006
Client: Iron Gate Hydroelectric Power Plants LLC

Preliminary Design for the Protection of the Right Bank of the Sava River in the Vicinity of the Central Wastewater Treatment Plant in the City of Šabac
Year: 2006
Client: Water Utility of Šabac

Preliminary Design for the Protection of the Town of Kučevo from High Flows of the Pek River and Its Tributaries: Completion of the Protection System
Year: 2006
Client: Serbia Waters

Expert Report and Guidance Document for Sand and Gravel Dredging from the Drina River at the Kovačevac Borrow  Site near Badovinci
Year: 2006
Client: ABK, Bogatić

Expert Report and Guidance Document for Gravel Dredging from the Drina River at Loznica (rkm 53+900 to rkm 54+550)
Year: 2006
Client: MN LLC, Loznica

Expert Report on the Possibility of Operation of the Iron Gate 1 HPNS in the 69.5+ Regime at the Mouth of the Nera River
Year: 2006
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Expert Opinion on the Method and Conditions for Operation of the Vlasina HPP’s (as required for a water permit renewal)
Year: 2006
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Preliminary Design for the Protection of the City of Zaječar from the Beli Timok River Floods between the Zaječar-Veliki Izvor Road Bridge and the Zaječar-Vrška Čuka Road Bridge
Year: 2006
Client: Serbia Waters

Convention on the Utilization and Maintenance of the Iron Gate 1 and Iron Gate 2 Hydro Power and Navigation Systems Apply
Year: 2006
Client: Electric Power Industry of Serbia/Iron Gate Hydro Power Plants LLC

Master Plan and Prefeasibility Study for the Training of the Južna Morava River between its Confluence with the Zapadna Morava River and Grdelica
Year: 2005
Client: Serbia Waters

Study: Proposed Groundwork for Negotiations and Drafting of a Bilateral Agreement on Sustainable Management of Transboundary Water Resources between Serbia & Montenegro and Bulgaria
Year: 2005
Client:    Serbian Ministry of Agriculture, Forestry and Water Management /Water Directorate

Detailed Design for the Channelization of the „Old Mlava“ in Threatened Populated Areas
Year: 2005
Client: Serbia Waters

Master Plan for the Training of Small Watercourses in the Topčider River Catchment Area: the Dućevac and the Palanka
Year: 2005
Client: Serbia Waters /Sava-Danube WMC  

Hydrologic, Hydraulic and Psammologic Investigations and Assessments Related to the Gas Pipeline Passage under the Velika Morava River at Požarevac
Year: 2005
Client: Energogas

Study of Measures and Works Required for the Establishment of a Category IV International Waterway on the Sava River (rkm 0-209)
Year: 2005-2006
Client: Serbian Ministry of Agriculture, Forestry and Water Management /Water Directorate

Study: Proposed Groundwork for Negotiations and Drafting of a Bilateral Agreement on Sustainable Management of Transboundary Water Resources between Serbia & Montenegro and Romania
Year: 2004
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate  

Study of Sustainable Management of Transboundary Water Resources in the Danube, Sava and Bosut River Basins (in connection with the preparation of groundwork for negotiations and drafting of a bilateral agreement with Croatia)
Year: 2004
Client:    Serbian Ministry of Agriculture, Forestry and Water Management  

Study of Sustainable Management of Transboundary Water Resources in the Sava and Drina River Basins (in connection with the preparation of groundwork for negotiations and drafting of a bilateral agreement with Bosnia and Herzegovina)
Year: 2004
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Proposed Groundwork for Negotiations and Drafting of a Bilateral Agreement on Sustainable Management of Transboundary Water Resources between Serbia & Montenegro and Hungary
Year: 2004
Client: Serbian Ministry of Agriculture, Forestry and Water Management  

Sectoral Study, Volume 2: Protection Against the Adverse Effects of Water, Section 2/1: Flood Protection
Year: 2004
Client: Serbian Ministry of Agriculture, Forestry and Water Management  

Preliminary Design for Flood Protection from the Vitovnica River between its Confluence with the Mlava River and the Town of Kula
Year: 2004
Client: Serbia Waters

Amendment to the Detailed Design for the Training of the Vitovnica River in the Town of Kula
Year: 2004
Client: Serbia Waters

Preliminary Design for the Protection of the Town of Petrovac, the Reconstruction of Dikes along the Mlava River in Petrovac, and the Training of the Mlava River between Petrovac and the Community of Leskovac
Year: 2004
Client: Serbia Waters

Detailed Design for the Reconstruction of Dikes along the Mlava River in the Town of Petrovac and for the Training of the Mlava River between Petrovac and the Community of Leskovac
Year: 2004
Client: Serbia Waters

Hydrologic and Hydraulic Reconstruction of the June 2002 Flood Wave in the Mlava River Basin and Detailed Design for the Reconstruction of the Dike between Bradarac and Veliko Selo
Year: 2004
Client: Serbia Waters /Sava WMC

Preliminary Design for the Protection of Communities in the Riparian Lands of the „Old Mlava“
Year: 2004
Client: Serbia Waters

Assessment of the Danube River Channel near the Underwater Oil Pipeline Passage at Sotin
Year: 2004
Client: Transoil Co., Pančevo

Assessment of the Tisa River Channel near the Underwater Oil Pipeline Passage at Titel
Year: 2004
Client: Transoil Co., Pančevo

Preliminary Design for the Training of Small Watercourses in the Topčider River Catchment Area: Hydrologic Component
Year: 2004
Client: Serbia Waters

Morphological Changes in the Iron Gate 1 HPNS and Iron Gate 2 HPNS Reservoirs between the Mouths of the Nera and Timok Rivers during the 1989-1997 Period
Year: 2004
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Morphological Changes in the Iron Gate 1 HPNS Reservoir Downstream from the Mouth of the Nera River during the 1988-2001 Period
Year: 2004
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Master Plan and Feasibility Study for the Training of the Unstable Danube River Channel and Rehabilitation of Riverbanks along the Apatin Stretch
Year: 2004-2006
Client: Serbian Ministry of Agriculture, Forestry and Water Management /Water Directorate

Annual Reports on Monitoring and Assessment of the Impact of Iron Gate 1 HPNS and Iron Gate 2 HPNS Reservoirs on Riparian Lands of the Danube River: Program 1, Iron Gate 1 – Surface Water
Year: 2004-2008
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

2001-2003 Annual Reports on Hydro-meteorological Research and Investigations Conducted in the Catchment Area of the Temska and Jerma Rivers and a Portion of the Nišava River Basin
Client:  Zavoj HPP, Pirot

Detailed Design for the Training of the Jadar River at Osečina
Year: 2003
Client: Serbia Waters

Expert Opinion on the Condition of the Infrastructure and the Effectiveness of Protection of Iron Gate 1 HPNS Reservoir Riparian Lands
Year: 2003
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Study: Protection of Hydropower Reservoirs from Siltation and Surface Sediment Ingress, Phase 1: Reservoir Protection from Siltation
Year: 2003
Client: Serbian Ministry of Agriculture, Forestry and Water Management/Water Directorate

Detailed Design for a Temporary River Channel Structure for the Passage of Heavy Machinery Across the Mlava River
Year: 2003
Client: Electric Power Industry of Serbia/Kostolac Mining Co.

Study of Flood Forecasting and Warning Reliability Enhancement, Volume 4: Proposed Network of Hydrological and Meteorological Monitoring Stations for Flood Protection
Year: 2003
Client: Serbia Waters

Study of Flood Forecasting and Warning Reliability Enhancement, Volume 5: Proposed Scheme for Information Flow to Flood Defense Participants
Year: 2003
Client: Serbia Waters

Assessment of the Interaction Between the Strip Mine and the Danube River and Riparian Land Water Regime, Including a Proposed Protection Solution for the Extended Kovin Mine Field A
Year: 2003
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Preliminary Design for Flood Protection of the Area between  the Mouth of the Vitovnica River and the Town of Kula
Year: 2003
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Expert Opinion on the Impact of the Proposed Use of Foreland along the Right Bank of the Danube on Flood Protection Systems (rkm 1110- 1111)
Year: 2002
Client: Yupetrol LLC

Study of Protection of the City of Niš from Flooding of the Nišava River and Its Tributaries
Year: 2002
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Assessment of a Proposed Modification to the Detailed Design for the Reconstruction of the Dike along the Right Bank of the Sava River, Between the Upstream and Downstream Dams at Ada Ciganlija
Year: 2002
Client: Serbia Waters /Sava WMC

Study of Flood Protection of the City of Niš from the Nišava River and its Tributaries; Hydrologic Assessment
Year: 2002
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Study of the Potential for Creating Small Reservoirs in the Peštan and Lukavica River Basins
Year: 2002
Client: Serbia Waters /Sava WMC

City of Belgrade Water Management Issues and Future Development Guidelines
Year: 2002
Client: Serbia Waters /Sava WMC

Estimation of Iron Gate 1 HPP Reservoir Water Levels
Year: 2002
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Hydrologic and Hydraulic Groundwork for the Estimation of Electric Power Generated by the Romanian HPP from the Yugoslav Hydropower Potential Upstream from the Nera River Mouth (69.5+ m a.s.l.)
Year: 2002
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Assessment of the Impact of the Iron Gate 1 HPNS in the 69.5+ Regime at the Mouth of the Nera River on Yugoslav Riparian Lands during the 1985-2000 Period
Year: 2002
Client: Electric Power Industry of Serbia/Iron Gate Hydroelectric Power Plants LLC

Study of Training of Torrential Tributaries of the Mileševka River Between its Confluence with the Lim and the Mileševa Monastery: Hydrologic Assessment
Year: 2001
Client: Serbia Waters/Sava WMC, Belgrade

Study of Floodwater and Ice Flow on the Tamiš River Between Boka and Čebza
Year: 2001
Client: Serbia Waters

Hydrologic and Hydraulic Reconstruction of Flood Waves on the Tamiš River Between  Sečanj and Čebza in February 1999 and April 2000
Year: 2001
Client: Serbia Waters

Study of the Potential for the Reduction of River Sediment Ingress into the Danube-Tisa-Danube Water System Canals, Bačka Section
Year: 2001
Client: Serbia Waters

Design Concept for the Training of Small Watercourses in the Topčider River Catchment Area
Year: 2001
Client: Serbia Waters

Study of Training of Torrential Tributaries of the Lim River within the Priboj Municipality
Year: 2001
Client: Serbia Waters /Sava WMC

Hydrologic and Hydraulic Reconstruction of June 2001 Flood Waves within the Area Managed by the Sava Water Management Center
Year: 2001
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Monitoring of Morphological Changes in the Sava and Drina River Channels
Year: 2000
Client: Serbia Waters/Danube WMC, Novi Sad

Hydrologic Assessments and Hydraulic Analyses of the Impact of Existing and Proposed Works in the Karaš River Basin on the High-Flow Regime at the State Border
Year: 2000
Client: Serbia Waters

Hydraulic Reconstruction of 8-16 June 1999 Floods on Serbia’s Watercourses
Year: 2000
Client: Serbian Ministry of Agriculture, Forestry and Water Management

Study of Training of the Sava-River Bosut Curve (at rkm 160 km)
Year: 2000
Client: Serbia Waters

Study of Flood Forecasting and Warning Reliability Enhancement
Client: Serbia Waters

Master Plan for the Training of the Velika Morava River from its Confluence with the Danube River to the Confluence of the Zapadna Morava and Južna Morava Rivers
Client: Serbia Waters

 

presentation_buton

RocketTheme Joomla Templates