Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

Наручилац: ЈП Србијаводе Одговорни пројектанти: Миодраг Поповић, дипл. грађ.инг., Владимир Јеленкови...

Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

Client: The Urban Institute, WashingtonProject leader: Zoran Radenković, B.Sc. C.E.Responsible...

Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

Client : PUC. "Water and Sewerage" - Novi Sad Project Coordinator: Dusan Đuric, B.Sc. C.E. Pro...

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube...

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade (Section...

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac (100,000...

Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

Preliminary Design for Wastewater Collection, Evacuation and Treatment at the Jabučko Ravnište...

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić,...

Prefeasibility Study and Master Plan for the Belgrade Sewerage System

Client: Building Land and Construction Directorate of Belgrade Chief Design Engineers: Branislav...

  • Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

    Wednesday, 16 January 2013 12:43
  • Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

    Monday, 14 January 2013 16:05
  • Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

    Monday, 14 January 2013 14:08
  • Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

    Monday, 16 August 2010 14:36
  • Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

    Friday, 02 July 2010 17:18
  • Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

    Monday, 16 August 2010 14:38
  • Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

    Monday, 16 August 2010 14:44
  • Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

    Monday, 16 August 2010 14:42
  • Prefeasibility Study and Master Plan for the Belgrade Sewerage System

    Monday, 16 August 2010 14:42
  • Study of the Impact of the Iron Gate 1 HPP on the Belgrade Groundwater Source (Phase IIb)

    Friday, 02 July 2010 16:41