Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

Наручилац: ЈП Србијаводе Одговорни пројектанти: Миодраг Поповић, дипл. грађ.инг., Владимир Јеленкови...

Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

Client: The Urban Institute, WashingtonProject leader: Zoran Radenković, B.Sc. C.E.Responsible...

Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

Client : PUC. "Water and Sewerage" - Novi Sad Project Coordinator: Dusan Đuric, B.Sc. C.E. Pro...

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube...

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade (Section...

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac (100,000...

Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

Preliminary Design for Wastewater Collection, Evacuation and Treatment at the Jabučko Ravnište...

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić,...

Prefeasibility Study and Master Plan for the Belgrade Sewerage System

Client: Building Land and Construction Directorate of Belgrade Chief Design Engineers: Branislav...

  • Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

    Wednesday, 16 January 2013 12:43
  • Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

    Monday, 14 January 2013 16:05
  • Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

    Monday, 14 January 2013 14:08
  • Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

    Monday, 16 August 2010 14:36
  • Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

    Friday, 02 July 2010 17:18
  • Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

    Monday, 16 August 2010 14:38
  • Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

    Monday, 16 August 2010 14:44
  • Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

    Monday, 16 August 2010 14:42
  • Prefeasibility Study and Master Plan for the Belgrade Sewerage System

    Monday, 16 August 2010 14:42
  • Study of the Impact of the Iron Gate 1 HPP on the Belgrade Groundwater Source (Phase IIb)

    Friday, 02 July 2010 16:41
Projects Prefeasibility Study and Master Plan for the Belgrade Sewerage System
Prefeasibility Study and Master Plan for the Belgrade Sewerage System PDF Print E-mail

altClient: Building Land and Construction Directorate of Belgrade
Chief Design Engineers: Branislav Hiba, CE; Miodrag Popović, CE; Vladimir Jelenković, ChE

The Building Land and Construction Directorate of the City of Belgrade commissioned this project as part of a comprehensive initiative to maximize harmonization of wastewater and stormwater evacuation and treatment within the City of Belgrade with EU standards in the foreseeable future. Enthusiastically responding to this initiative, the Project Engineer (JCI and DHI Water-Environment-Health from Denmark), proceeded with the development of the Master Plan in full compliance with the Client’s vision laid down in the Project Terms of Reference. The School of Civil Engineering of the University of Belgrade played an active role by providing ongoing project monitoring assistance to the Client.

In view of the highly-complex context and the fact that project activities are currently still under way, only a summary of major project components is provided below.

The Project Engineers’ vision of the future Belgrade sewerage system is based on the following major components:

  • Improved service through safe urban wastewater evacuation and treatment at suitable facilities;
  • Enhanced conditions of the immediate and extended environment through better protection of rivers and urban streams from uncontrolled discharges of untreated wastewater;
  • Protection of urban drinking water sources from wastewater pollution hazards;
  • Safety/protection of human life and assets from the adverse effects of stormwater flooding (addressing potential climate change and extreme rainfall events).

The Project Engineer has already undertaken a number of activities, which can be summarized as follows:

  • Measurements conducted to identify wastewater and stormwater quality and quantity;
  • Assessments of existing and future hydraulic loads of the sewerage system;
  • Analyses of current and future wastewater and sludge quality, and assessment of wastewater pollution levels;
  • Development of a mathematical model, based on a GIS platform and the existing sewerage system database;
  • Calibration of the mathematical model based on processed data;
  • Assessment of existing sewer network performance under various scenarios, including accident situations;
  • Development of a proposed strategy for expansion and performance upgrading of the sewerage system, including resolution of wastewater treatment issues and addressing the number and capacities of wastewater treatment plants and the preferred treatment technology.


Completed activities and derived conclusions are presented in a Project Document Package comprised of:

Section 1.1.    Results of Research and Investigations
Section 1.2.    Current Wastewater Quality and Quantity  
Section 1.3.    Proposed Service Standards and Design Criteria
Section 1.4.    Condition of the Existing Sewerage System
Section 1.5.  Hydraulic and Hydrologic Modeling, Calibration, and Assessment of Current Sewerage System Performance
Section 1.6.    Projected Wastewater Quality and Quantity
Section 1.7.    Sludge Management Strategy
Section 1.8.    Revitalization Strategy for Urban Streams
Section 1.9.    Environmental Impact Assessment
Section 1.10.  Sewerage System Development and Upgrading Strategy

Based on progress made to date and the timetable for the remaining activities, the entire Project Document Package will be completed by the end of 2010.

 

 