Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

Наручилац: ЈП Србијаводе Одговорни пројектанти: Миодраг Поповић, дипл. грађ.инг., Владимир Јеленкови...

Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

Client: The Urban Institute, WashingtonProject leader: Zoran Radenković, B.Sc. C.E.Responsible...

Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

Client : PUC. "Water and Sewerage" - Novi Sad Project Coordinator: Dusan Đuric, B.Sc. C.E. Pro...

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube...

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade (Section...

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac (100,000...

Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

Preliminary Design for Wastewater Collection, Evacuation and Treatment at the Jabučko Ravnište...

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić,...

Prefeasibility Study and Master Plan for the Belgrade Sewerage System

Client: Building Land and Construction Directorate of Belgrade Chief Design Engineers: Branislav...

  • Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

    Wednesday, 16 January 2013 12:43
  • Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

    Monday, 14 January 2013 16:05
  • Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

    Monday, 14 January 2013 14:08
  • Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

    Monday, 16 August 2010 14:36
  • Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

    Friday, 02 July 2010 17:18
  • Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

    Monday, 16 August 2010 14:38
  • Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

    Monday, 16 August 2010 14:44
  • Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

    Monday, 16 August 2010 14:42
  • Prefeasibility Study and Master Plan for the Belgrade Sewerage System

    Monday, 16 August 2010 14:42
  • Study of the Impact of the Iron Gate 1 HPP on the Belgrade Groundwater Source (Phase IIb)

    Friday, 02 July 2010 16:41
Projects Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort
Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort PDF Print E-mail

Preliminary Design for Wastewater Collection, Evacuation and Treatment at the Jabučko Ravnište Resort (Phase 1) on Mt. Stara Planina

jabuckoClient: Mt. Stara Planina PE
Chief Design Engineers:    Vladimir Jelenković, ChE; Miodrag Popović, CE; Branislav Hiba, CE

For purposes of this Preliminary Design, the Department has undertaken detailed prospecting of the site, consulted with the contracting authority, reviewed available documentation and information, and collected extensive data pertaining to the future water supply and wastewater generation. The Preliminary Design addresses several wastewater treatment options, which comply with the Serbian Water Management Strategy, the Planning and Construction Law, other applicable national legislation, and EU legislation. The documentation package proposes the best technical solution, to be used as a basis for future action pertaining to wastewater disposal and environmental protection.

Wastewater from the tourist resort will be delivered to a wastewater treatment plant (WWTP) via a Ø 500 mm gravity sewer. The site of the future WWTP was selected based on resort development plans, urban plans, and conditions at the Jabučko Ravnište Plateau.

The contracting authority requires the WWTP to be built in stages. The initial organic load capacity will correspond to a population equivalent (PE) of 900. As the resort grows, WWTP capacity will be increased to a total of 2700 PE.

In view of stringent environmental protection requirements, treated water must in no way disturb and/or threaten the stipulated water quality of the recipient – the Orao River – which is a Category I watercourse. For this reason, the selected wastewater treatment approach is based on low-load activated sludge and nano membrane technology. This technology is gaining widespread use throughout the world, in both new and reconstruction projects, and under diverse climatic and operational conditions. It ensures a high purification level and significant savings due to a compact biological treatment line. Effluent characteristics correspond to the highest level of tertiary treatment. For additional safety, treated water will be subjected to UV disinfection prior to discharge into the recipient.

Owing to intense aeration within the aeration zone, activated sludge will be aerobically stabilized (simultaneous stabilization), and for this reason the selected sludge treatment method is based on gravity thickening, chemical conditioning, and mechanical dewatering prior to sludge cake disposal.

The WWTP will include a pre-treatment stage for the ultimate capacity of 2700 PE (coarse screen and fine screen integrated with an aerated sand trap) and three membrane units for biological treatment, 900 PE each.

 

Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4

Инвеститор:

ЈП Стара Планина

Одговорни пројектанти:

Владимир Јеленковић, дипл.инг.технол.,

Миодраг Поповић, дипл.инг.грађ.,

Бранислав Хиба, дипл.инг.грађ.

 