Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

Наручилац: ЈП Србијаводе Одговорни пројектанти: Миодраг Поповић, дипл. грађ.инг., Владимир Јеленкови...

Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

Client: The Urban Institute, WashingtonProject leader: Zoran Radenković, B.Sc. C.E.Responsible...

Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

Client : PUC. "Water and Sewerage" - Novi Sad Project Coordinator: Dusan Đuric, B.Sc. C.E. Pro...

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube...

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade (Section...

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac (100,000...

Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

Preliminary Design for Wastewater Collection, Evacuation and Treatment at the Jabučko Ravnište...

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić,...

Prefeasibility Study and Master Plan for the Belgrade Sewerage System

Client: Building Land and Construction Directorate of Belgrade Chief Design Engineers: Branislav...

  • Basic Design for the Collection, Evacuation and Treatment of Wastewater for Tourist Resort "Kopaonik" - Phase I

    Wednesday, 16 January 2013 12:43
  • Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020

    Monday, 14 January 2013 16:05
  • Design Project of ‘’Petrovaradinska Ada Source Extension by Building Water Intake Near the River

    Monday, 14 January 2013 14:08
  • Prefeasibility Study and Master Plan for a Wastewater Treatment Plant on the Left Bank of the Danube

    Monday, 16 August 2010 14:36
  • Interceptor Sewer Between the Danube/Sava Confluence and the Veliko Selo Suburb of Belgrade

    Friday, 02 July 2010 17:18
  • Feasibility Study and Master Plan for a Wastewater Treatment Plant in the City of Leskovac

    Monday, 16 August 2010 14:38
  • Preliminary Design for Wastewater Collection, Evacuation & Treatment at the Jabučko Ravnište Resort

    Monday, 16 August 2010 14:44
  • Feasibility Study and Environmental Impact Assessment for the Wastewater Project in Nikšić

    Monday, 16 August 2010 14:42
  • Prefeasibility Study and Master Plan for the Belgrade Sewerage System

    Monday, 16 August 2010 14:42
  • Study of the Impact of the Iron Gate 1 HPP on the Belgrade Groundwater Source (Phase IIb)

    Friday, 02 July 2010 16:41
Projects Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020
Study of Underground Sources of Water Supply for the General Plan of the City of Leskovac, 2010-2020 PDF Print E-mail

leskovac01_engClient: The Urban Institute, Washington
Project leader:
Zoran Radenković, B.Sc. C.E.
Responsible engineer: Miloš Zorić, B.Sc. C.E.

The study of underground water supply sources for the General Plan of the City of Leskovac 2010-2020 included the preparation of the following documents:

  • The project of applied hydrogeological research;
  • Elaborate on the reserves of underground water sources for water supply of Leskovac;
  • Study of sanitary protection zones for water supply of Leskovac.

Leskovac water supply was based on the intake of water from underground neogene aquifers till 2011. 4 wells were established for public water supply of Leskovac, some of which are in operation for over 40 years. Wells from the sources cap the aquifer formed within neogenic sediments.

Hydrogeological investigations for the purpose of making the Study in the area of Leskovac valley were carried out in the period Feb-August 2010. Applied research methods consisted of: general overview of the geological and hydro geological characteristics of the wider area, a preliminary analysis of hydrodynamic conditions on the basis of available data on the regime of exploitation and groundwater level fluctuations, defined concept of detailed examination, formation of mathematical model and analysis of modes "shallow" and "deep" aquifer in the wider area of the source and hydrodynamic flow conditions.

The analysis of the data available from previous stages of research and new data showed that long-term exploitation did not cause general decrease in aquifers at the site. It was found that recharge of aquifers is done at the expense of water from a "shallow" alluvial aquifer (directly or through intermediate layer) into a "deeper" neogene aquifer. In certain areas infiltration is intense. Such hydro geologic conditions provided a stable long-term exploitation without the over-exploitation on sources...

Within these elaborates, model tests were carried out. In accordance with established hydro geological and hydrodynamic conditions and confirmed calculations of the hydrodynamic model, sanitary protection zones were determined as well as groundwater reserves for all 4 sources.

leskovac02_eng

 

presentation_buton